Bathroom Fitting
The Downtown Bathroom
Duration
3 Weeks
Hours On Site
410 Hrs
Size (SqFt)
65 SqFt
Year
2025
Challenge
A dated primary bathroom with a cramped tub-shower combo and low ceilings that made the room feel smaller than it was.
Approach
We replaced the tub with a curbless shower, added radiant floor heating, and used large-format tile to visually open up the space.
Result
A bathroom that reads twice its actual size, finished in three weeks flat.
Material
Large-format porcelain tile, matte black fixtures, radiant floor system

Three weeks start to finish and it already feels like the best room in the house.