AfterBefore
Logo

Bathroom Fitting

The Sequoia Hills Bathroom

A fast, clean bathroom refit completed in two weeks while the family stayed in the home throughout.

A fast, clean bathroom refit completed in two weeks while the family stayed in the home throughout.

Duration

2 Weeks

Hours On Site

260 Hrs

Size (SqFt)

55 SqFt

Year

2024

Challenge

A primary bathroom in need of a fast refit, with the family planning to stay in the home throughout construction.

Approach

We sealed off the work zone, scheduled the crew around the family's daily routine, and completed the refit with minimal disruption.

Result

A fast, clean refit finished in two weeks with the family living in the home the entire time.

Material

Porcelain tile, brushed nickel fixtures, updated ventilation

They sealed off the kitchen properly and kept the mess contained. We barely noticed construction was happening most days.

Priya S.

Sequoia Hills, Ashford

Begin your Transformation

Let's Redesign the way you live.

A free on-site consultation, a response within 24 hours, and a plan built around your home not a template.

AfterBefore
Logo

Begin your Transformation

Let's Redesign the way you live.

A free on-site consultation, a response within 24 hours, and a plan built around your home not a template.

AfterBefore
Logo

Begin your Transformation

Let's Redesign the way you live.

A free on-site consultation, a response within 24 hours, and a plan built around your home not a template.

AfterBefore
Logo

© 2026 Renover Studio. Licensed & insured.

Template by @hoppra

© 2026 Renover Studio. Licensed & insured.

Template by @hoppra

© 2026 Renover Studio. Licensed & insured.

Template by @hoppra

Create a free website with Framer, the website builder loved by startups, designers and agencies.